WESTOWN RESIDENCE BLOCK 26 (ONE16) PROJECT - INFRASTRUCTURE PACKAGE - global
14977
post-template-default,single,single-post,postid-14977,single-format-gallery,bridge-core-2.3.6,mltlngg-en_US,ajax_fade,page_not_loaded,,hide_top_bar_on_mobile_header,qode-theme-ver-22.2,qode-theme-bridge,wpb-js-composer js-comp-ver-6.2.0,vc_responsive,elementor-default,elementor-kit-15521
 

WESTOWN RESIDENCE BLOCK 26 (ONE16) PROJECT - INFRASTRUCTURE PACKAGE

WESTOWN RESIDENCE BLOCK 26 (ONE16) PROJECT - INFRASTRUCTURE PACKAGE

Project Client SODIC
Consultant ALAMAR
Location 6th of October, Cairo
Scope of work Execution of MEP Infrastructure Networks including Earthwork, Water, Drainage, Irrigation, Fire Fighting, Low current, Medium Voltage and Low voltage Cables Networks, Construction of Pump Room and Swimming Pools