Saoud & El-Husseiniya Wastewater Treatment Plants
Full replacement and renovation of the El-Husseiniya and Saoud sewage treatment plants and their associated lifting pump stations. Executed under the presidential "Decent Life" (Hayah Kareema) initiative.
Key Specs & Works:
- Infrastructure Expansion: Structural reinforcement of sewage processing basins.
- Electromechanical Upgrade: Installation of high-capacity intake pumps, aeration blowers, and automated flow control systems.
- Hayah Kareema Initiative: Upgraded rural sanitation for over 100,000 residents.
New Alamein Seawater Reverse Osmosis (SWRO) Plant
Execution, installation, and testing of all Mechanical, Electrical, and Plumbing (MEP) systems, piping networks, and specialized heavy-fuel distribution systems inside the reverse osmosis desalination plant.
Key Specs & Works:
- SWRO Technology: Precision piping installation for high-pressure seawater reverse osmosis membranes.
- Fuel Systems: Heavy fuel storage, pumping loop, and distribution networks for standby power generators.
- Potable Supply: Core infrastructure securing fresh drinking water for Alamein city expansion.
Abo Jalal Sewage Treatment Plant
Comprehensive design, civil construction, equipment installation, and commissioning of a bilateral sewage treatment plant with a capacity of 20,000 cubic meters per day. Executed under the Hayah Kareema initiative.
Key Specs & Works:
- High Capacity: Daily biological treatment of 20,000 m³ of wastewater.
- Process Optimization: Fine screen filters, grit removal chambers, and chemical dosing systems.
- Sustainability: Safe treated effluent discharge matching environmental safety codes.
Gannet Misr Irrigation Lifting Pump Stations
Full electromechanical installation for the irrigation lifting stations as part of the "Gannet Misr" national agricultural reclamation initiative to achieve regional food security.
Key Specs & Works:
- Pump Stations: Assembly and alignment of horizontal split-case water pumps.
- Electrical Systems: Low and medium voltage switchgear, distribution panels, and transformers.
- Automation: Integrated control systems protecting pumps against dry-runs and water hammer.
Uptown Cairo Golf Course Infrastructure & Lakes
Complete infrastructure execution for the world-class golf course, including drainage, irrigation, electrical power networks, and earthworks/lining for golf course aesthetic lakes.
Key Specs & Works:
- Course Shaping: 200,000+ m³ of cut and fill excavation to shape fairways and hazards.
- Aesthetic Lakes: Earthworks and geosynthetic clay liner installation to contain golf course lakes.
- Irrigation Network: Smart computerized sprinkler system optimizing water consumption.
Westown Domestic Drinking Water Tank & Pump Room
Full civil construction, plumbing, mechanical, and electrical installation of drinking water supply tanks. Outfitted with heavy-duty pump sets and automated control loops for a continuous municipal potable supply.
Key Specs & Works:
- Potable Safety: Food-grade epoxy coatings applied to the tank interior to safeguard water quality.
- Hydraulic Pumping: Parallel booster pumps with automated sequencing and cycle alternation.
- Valving: Precision pressure reducing valves (PRVs) and surge arrestors.
Westown Landscape Irrigation Tank & Pump Room
Civil construction and electromechanical fitting of an underground irrigation water storage tank and its adjoining pump room. The system provides automated watering for Westown's parks.
Key Specs & Works:
- Water Storage: Reinforced concrete underground water tank built with strict water-tightness codes.
- Pump Room: Multi-stage vertical booster pumps with variable frequency drives (VFD) for pressure control.
- Automation: SCADA-linked control panel enabling remote telemetry.
VYE 464 Feddans - Main Trunk Infrastructure & SCADA
Construction and commissioning of main utilities: smart irrigation loop, combined sewage & storm gravity trunks, civil/MEP for three lift stations, medium-voltage distribution, SCADA system automation, and full road network paving.
Key Specs & Works:
- Lift Stations: Civil works, mechanical bar screens, submersible pumps, and odor control for 3 stations.
- SCADA Integration: Programmable logic controllers (PLCs), instrumentation, and fiber links mapping back to central control.
- Road Paving: Subgrade preparation, aggregate base, asphalt binder, interlock sidewalk tiles, and traffic signs.
South Helwan Supercritical Power Plant (1950 MW)
Full mechanical installation, electrical wiring, and HVAC system execution for the Steam Turbine Generator (STG 1, 2, & 3) areas, water treatment facilities, control rooms, and heavy fuel oil buildings for a 1,950 MW complex.
Key Specs & Works:
- HVAC Scope: Heavy industrial chiller units, explosion-proof ductworks, and air handling units.
- Electrical: Medium-voltage terminations, cable trays, instrument calibrations, and main earthing grids.
- STG Building: Mechanical assembly support for three 650 MW turbine-generators.
Villette Project - Infrastructure & Roads (Zones D & E)
Bilingual utility infrastructure installation for the expansion of Sodic Villette Zones D and E. Includes laying low-current, medium-voltage power grid, water pipelines, firefighting loop, and paved sidewalks.
Key Specs & Works:
- Sidewalks & Pavers: 35,000 m² of custom design concrete interlock unit pavers.
- Utilities Loop: Safe trenching and installation of water supply pipelines and irrigation lines.
- Substations: Structural foundation and cabling for regional electricity distribution cabinets.
Marassi Infrastructure & Utilities
Utility networks, water networks, drainage, electrical grid installations, and road paving.
Key Specs & Works:
- Utility Networks: Firefighting loops, sewage pipelines, and potable water network.
- Civil Works: Excavations, trench backfilling, and paved road asphalt.
- Power Grids: Low-current provisions and electrical cabinet installations.
City of Scientific Research and Technological Applications
Complete installation and testing of main electrical boards, central air conditioning, and ventilation.
Key Specs & Works:
- HVAC Systems: Heavy-duty central chillers, air ducts, and air handling units.
- Electrical: Main distribution boards, lighting controls, and safety earthing networks.
- Fire Protection: Automated fire alarm sensors, main pump room, and sprinklers.
ARGO Headquarters Administrative Building
Integrated fit-out and electromechanical (MEP) installations for corporate offices.
Key Specs & Works:
- MEP Installation: Cable management, low current systems, and office ventilation loops.
- Smart Office: Automated temperature control, IP cameras, and biometric access.
- Power: Uninterruptible Power Supply (UPS) backup and power stabilizer units.