Saoud & El-Husseiniya Wastewater Treatment Plants
Full replacement and renovation of the El-Husseiniya and Saoud sewage treatment plants and their associated lifting pump stations. Executed under the presidential "Decent Life" (Hayah Kareema) initiative.
Key Specs & Works:
- Infrastructure Expansion: Structural reinforcement of sewage processing basins.
- Electromechanical Upgrade: Installation of high-capacity intake pumps, aeration blowers, and automated flow control systems.
- Hayah Kareema Initiative: Upgraded rural sanitation for over 100,000 residents.
New Alamein Seawater Reverse Osmosis (SWRO) Plant
Execution, installation, and testing of all Mechanical, Electrical, and Plumbing (MEP) systems, piping networks, and specialized heavy-fuel distribution systems inside the reverse osmosis desalination plant.
Key Specs & Works:
- SWRO Technology: Precision piping installation for high-pressure seawater reverse osmosis membranes.
- Fuel Systems: Heavy fuel storage, pumping loop, and distribution networks for standby power generators.
- Potable Supply: Core infrastructure securing fresh drinking water for Alamein city expansion.
Abo Jalal Sewage Treatment Plant
Comprehensive design, civil construction, equipment installation, and commissioning of a bilateral sewage treatment plant with a capacity of 20,000 cubic meters per day. Executed under the Hayah Kareema initiative.
Key Specs & Works:
- High Capacity: Daily biological treatment of 20,000 m³ of wastewater.
- Process Optimization: Fine screen filters, grit removal chambers, and chemical dosing systems.
- Sustainability: Safe treated effluent discharge matching environmental safety codes.