Kafr Al Dabousy Sewage Treatment Plant
Full engineering, procurement, construction (EPC), testing, commissioning, and operation of Kafr El-Dabousy sewage treatment plant. The plant operates with a total capacity of 5,000 m³/day and was executed as a strategic part of the Presidential Initiative "Hayah Kareema"
Saoud & El-Husseiniya Wastewater Treatment Plants
Full replacement and renovation of the El-Husseiniya and Saoud sewage treatment plants and their associated lifting pump stations. Executed under the presidential "Decent Life" (Hayah Kareema) initiative.
New Alamein Seawater Reverse Osmosis (SWRO) Plant
Execution, installation, and testing of all Mechanical, Electrical, and Plumbing (MEP) systems, piping networks, and specialized heavy-fuel distribution systems inside the reverse osmosis desalination plant.
Abo Jalal Sewage Treatment Plant
Comprehensive design, civil construction, equipment installation, and commissioning of a bilateral sewage treatment plant with a capacity of 20,000 cubic meters per day. Executed under the Hayah Kareema initiative.
Key Specs & Works:
- High Capacity: Daily biological treatment of 20,000 m³ of wastewater.
- Process Optimization: Fine screen filters, grit removal chambers, and chemical dosing systems.
- Sustainability: Safe treated effluent discharge matching environmental safety codes.